02/25/2021 |
Detector DAQ [lackey32]
Expert
TDU
Updating expected offset time for 1Hz in TDU status code.
For some reason since sometime yesterday the TDUs have been showing a larger offset, around 155 clock ticks. Abhilash and David tried scrubbing the TDUs, but this didn't fix the issue. Something with the timing of the 1 Hz ($8F) signal must have changed. We saw it change once before, coming out of the 2019 shutdown. Interestingly, it appears to have changed back to the offset we had in period 1 (spring 2019). After some digging, I've found the correct code to update.
• Added SHM_Utilities to testRel_TB17_00_00 and edited SHM_Utilities/cxx/src/DumpSpillHistory.cc.
• Reverted offset from 1115 to 960.
• Built package.
TDU status monitor looked better instantly, didn't even need to restart anything. |
|
|
9004
02/25/2021 18:42:53 |
Detector DAQ
Expert
TDU
|
|
|
Teresa Lackey Entry Subject: Updating expected offset time for 1Hz in TDU status code.
For some reason since sometime yesterday the TDUs have been showing a larger offset, around 155 clock ticks. Abhilash and David tried scrubbing the TDUs, but this didn't fix the issue. Something with the timing of the 1 Hz ($8F) signal must have changed. We saw it change once before, coming out of the 2019 shutdown. Interestingly, it appears to have changed back to the offset we had in period 1 (spring 2019). After some digging, I've found the correct code to update.
• Added SHM_Utilities to testRel_TB17_00_00 and edited SHM_Utilities/cxx/src/DumpSpillHistory.cc.
• Reverted offset from 1115 to 960.
• Built package.
TDU status monitor looked better instantly, didn't even need to restart anything.
|
|
|
|
02/24/2021 |
Operations [torun]
Magnet
Controlled Access M1 swept
|
|
|
9003
02/24/2021 16:43:24 |
Operations
Magnet
|
|
|
Yagmur Torun Entry Subject: M1 swept
Form: | Controlled Access |
Controlled Access Leader: |
Yagmur
|
Others on Controlled Access: |
Mike Wallbank
|
Run Coordinator Approval: |
True
|
Shifter Informed: |
False
|
Controlled Access Purpose: |
Magnet area sweep before turning on the M1 PS.
|
Comments: |
|
|
|
|
|
02/11/2021 |
Detector DAQ [lackey32]
Expert
Computing Checklist
|
|
|
9002
02/11/2021 09:34:02 |
Detector DAQ
Expert
|
|
|
Teresa Lackey Entry Subject:
Form: | Computing Checklist |
: |
|
Is disk space on master okay?: |
Yes
|
Is disk space on the datadisk okay?: |
Yes
|
Are FTS transfers normal?: |
Yes
|
: |
|
Is the page up-to-date?: |
Yes
|
Are there any missing raw files?: |
No
|
Are there any missing database entries?: |
Missing DDActivity1 files
Missing Beamline files
Missing TBSpill files
|
Are there any missing root files?: |
No
|
Comments:: |
4 runs missing from the database. I'll deal with them on Sunday as usual.
|
|
|
|
|
02/08/2021 |
Detector DAQ [lackey32]
Expert
Computing Checklist
|
|
|
9001
02/08/2021 10:34:43 |
Detector DAQ
Expert
|
|
|
Teresa Lackey Entry Subject:
Form: | Computing Checklist |
: |
|
Is disk space on master okay?: |
Yes
|
Is disk space on the datadisk okay?: |
Yes
|
Are FTS transfers normal?: |
Yes
|
: |
|
Is the page up-to-date?: |
Yes
|
Are there any missing raw files?: |
No
|
Are there any missing database entries?: |
No
|
Are there any missing root files?: |
No
|
Comments:: |
|
|
|
|
|
02/05/2021 |
Operations [torun]
Expert
TOF
Trigger
Controlled Access
|
|
|
9000
02/05/2021 18:22:33 |
Operations
Expert
TOF
Trigger
|
|
|
Yagmur Torun Entry Subject:
Form: | Controlled Access |
Controlled Access Leader: |
Mike Wallbank
|
Others on Controlled Access: |
Yagmur
|
Run Coordinator Approval: |
True
|
Shifter Informed: |
True
|
Controlled Access Purpose: |
DAQ timing calibration
|
Comments: |
This was earlier in the day (about 1:30-4:30pm).
Collected front-end/trigger timing data for TOFs, paddles and trigger board, data in Beamline runs 3697-3707, see NOvA-main-ECL entry 184107 for details.
|
|
|
|
|
02/05/2021 |
Detector DAQ [lackey32]
Expert
Nearline
OnMon/EVD
Setting up test-db-02
Since test-db is in a rack by itself that SCD would like to shutoff, Seth setup a new machine for us: novadaq-test-db-02. I'm starting to get the machine setup now. Once everything is setup I'll move EVD, OnMon, and all Nearline processing over. I'm not sure how long everything will take, so we might not get everything moved over today. |
|
|
8999
02/05/2021 14:26:36 |
Detector DAQ
Expert
Nearline
OnMon/EVD
|
|
|
Teresa Lackey Entry Subject: Setting up test-db-02
Since test-db is in a rack by itself that SCD would like to shutoff, Seth setup a new machine for us: novadaq-test-db-02. I'm starting to get the machine setup now. Once everything is setup I'll move EVD, OnMon, and all Nearline processing over. I'm not sure how long everything will take, so we might not get everything moved over today.
|
|
|
|
02/03/2021 |
Operations [torun] Controlled Access
|
|
|
8998
02/03/2021 14:05:52 |
Operations
|
|
|
Yagmur Torun Entry Subject:
Form: | Controlled Access |
Controlled Access Leader: |
Mike Wallbank
|
Others on Controlled Access: |
Dave Northacker
Yagmur
|
Run Coordinator Approval: |
True
|
Shifter Informed: |
False
|
Controlled Access Purpose: |
- replace the N2 cylinder
- install the spare beamline DAQ machine
- reset the upstream WC controller
- check the DAQ front-end electronics cabling for future timing calibration work
- Mike and I went in a 2nd time to check the heaters in preparation for the week of severe cold ahead
|
Comments: |
- Had to shovel our way through on the way in.
- Dave moved N2 source to a new cylinder.
- Mike and I installed beamlinedaq01 in the beamline rack. We briefly turned off the SiPM preamp power supplies and moved their power cords to the yellow power strip at the bottom of the rack in order to free up a couple of outlets for the server. We also pulled a pair of network cables from the switch in the network rack to the beamline rack: 1 spare and 1 for the public interface (for which there was already a cable but it was used for the remote power strip)
- Mike power cycled the controller for the upstream beam WC
- Turned on the west heater and set it to 65F during the 2nd access
|
|
|
|
|
01/19/2021 |
DAQ [amhall]
Expert
Computing Checklist
|
|
|
8997
01/19/2021 10:22:40 |
DAQ
Expert
|
|
|
Anna Hall Entry Subject:
Form: | Computing Checklist |
: |
|
Is disk space on master okay?: |
Yes
|
Is disk space on the datadisk okay?: |
Yes
|
Are FTS transfers normal?: |
Yes
|
: |
|
Is the page up-to-date?: |
Yes
|
Are there any missing raw files?: |
No
|
Are there any missing database entries?: |
No
|
Are there any missing root files?: |
No
|
Comments:: |
Actually run 100996 looks like it is missing a single raw file (or two) but it was also a crashed run so I'm not concerned
|
|
|
|
|
01/15/2021 |
Operations [torun] Controlled Access 2ndary beam WC HV adjustments
|
|
|
8996
01/15/2021 15:02:42 |
Operations
|
|
|
Yagmur Torun Entry Subject: 2ndary beam WC HV adjustments
Form: | Controlled Access |
Controlled Access Leader: |
Yagmur
|
Others on Controlled Access: |
Mike Wallbank
|
Run Coordinator Approval: |
True
|
Shifter Informed: |
False
|
Controlled Access Purpose: |
- Lowered target WC HV from 2.4 to 2.35kV
- Moved the HV PS (Droege) for the upstream chamber to the MCenter Control Rm and connected it to #23 on the HV patch panel (which was unused)
- Claimed the HV cable from the LArIAT Muon Range Stack that was at #63 on the patch panel at MC7a, moved it to #23 (which was unused) and connected it to the chamber at the other end
- Set the HV for the upstream chamber to 2.0kV
|
Comments: |
We can now adjust the upstream chamber HV and reset the PS when it trips from the Control Room.
|
|
|
|
|
01/14/2021 |
Operations [torun] Controlled Access Magnet sweep
|
|
|
8995
01/14/2021 16:56:59 |
Operations
|
|
|
Yagmur Torun Entry Subject: Magnet sweep
Form: | Controlled Access |
Controlled Access Leader: |
Yagmur
|
Others on Controlled Access: |
Dung
|
Run Coordinator Approval: |
True
|
Shifter Informed: |
False
|
Controlled Access Purpose: |
Enclosure sweep before turning on the magnet.
|
Comments: |
Forgot to turn the lights off on my way out, Mike is coming in for another access.
|
|
|
|
|
01/12/2021 |
Operations [torun]
Beam
Approved for beam
Beam sign-offs in place, see
"MCR-Elog 184908":https://www-bd.fnal.gov/Elog/?orEntryId=184908 |
|
|
8994
01/12/2021 13:13:50 |
Operations
Beam
|
|
|
Yagmur Torun Entry Subject: Approved for beam
Beam sign-offs in place, see
MCR-Elog 184908
|
|
|
|
01/07/2021 |
Detector DAQ [lackey32]
Expert
Computing Checklist
|
|
|
8993
01/07/2021 10:31:50 |
Detector DAQ
Expert
|
|
|
Teresa Lackey Entry Subject:
Form: | Computing Checklist |
: |
|
Is disk space on master okay?: |
Yes
|
Is disk space on the datadisk okay?: |
Yes
|
Are FTS transfers normal?: |
Yes
|
: |
|
Is the page up-to-date?: |
Yes
|
Are there any missing raw files?: |
No
|
Are there any missing database entries?: |
Missing DDActivity1 files
Missing Beamline files
Missing TBSpill files
|
Are there any missing root files?: |
No
|
Comments:: |
I figure we should start doing this checklist again now that FTS is working. DB issues at all detectors, so the db is a few days behind.
|
|
|
 |
|
12/22/2020 |
Building [torun]
Beam
Shield wall complete
Good progress today,
* The last 2 blocks were installed in the morning
* The temporary platform used for bringing in concrete blocks was removed and the rollup door was returned to its previous state
* An MCR Ops team came by to inspect the layout and evaluate any changes needed for search & secure procedures and documentation
* While they were there, I adjusted the overhead mirror near the rollup door so it shows the entire top of the wall (no need to get up on the ROSIE ladder) |
|
|
8992
12/22/2020 15:47:56 |
Building
Beam
|
|
|
Yagmur Torun Entry Subject: Shield wall complete
Good progress today,
- The last 2 blocks were installed in the morning
- The temporary platform used for bringing in concrete blocks was removed and the rollup door was returned to its previous state
- An MCR Ops team came by to inspect the layout and evaluate any changes needed for search & secure procedures and documentation
- While they were there, I adjusted the overhead mirror near the rollup door so it shows the entire top of the wall (no need to get up on the ROSIE ladder)
|
|
Platform under/outside west rollup door removed |
IMG_6466.JPG |
|
|
|
|
|
12/22/2020 |
Operations [wallbank]
Beam
MWPC
Powered on the upstream wire chamber
I have just installed a 'new' MWPC controller (taken, with permission, from Ewa's area, where she was using it with the test stand) in the upstream location in MC7a. I also turned on the HV and set up the trigger signal to go to the controller.
All appears to be functioning correctly; I can communicate with the controller and I see counts on a scalar from cosmics.
The controller is ftbfwc04:
1) LOCAL IP : 131.225.176.162
2) G/W IP Addr : 131.225.176.200
3) SUBNET MASK : 255.255.255.0
4) MAC Addr(hex): 00.80.55.00.00.65 |
|
|
8991
12/22/2020 13:10:51 |
Operations
Beam
MWPC
|
|
|
Mike Wallbank Entry Subject: Powered on the upstream wire chamber
I have just installed a 'new' MWPC controller (taken, with permission, from Ewa's area, where she was using it with the test stand) in the upstream location in MC7a. I also turned on the HV and set up the trigger signal to go to the controller.
All appears to be functioning correctly; I can communicate with the controller and I see counts on a scalar from cosmics.
The controller is ftbfwc04:
1) LOCAL IP : 131.225.176.162
2) G/W IP Addr : 131.225.176.200
3) SUBNET MASK : 255.255.255.0
4) MAC Addr(hex): 00.80.55.00.00.65
|
|
|
|
12/21/2020 |
Planning [torun]
APD
Replacement fill cap
We have a missing cap on one of the bottom horizontal modules with Al foil covering the fill tube. I brought in a couple of PVC caps and left them on the unused chiller on the west side (in a Home Depot plastic shopping bag). We need the HV off on that module in order to install the cap (or just do it next time the detector is powered off). |
|
|
8990
12/21/2020 18:55:16 |
Planning
APD
|
|
|
Yagmur Torun Entry Subject: Replacement fill cap
We have a missing cap on one of the bottom horizontal modules with Al foil covering the fill tube. I brought in a couple of PVC caps and left them on the unused chiller on the west side (in a Home Depot plastic shopping bag). We need the HV off on that module in order to install the cap (or just do it next time the detector is powered off).
|
|
 |
|
12/21/2020 |
Building [torun]
Beam
Shield wall installation update
* Todd installed the beam pipe in the morning.
* The crew wanted feedback on the configuration after they started stacking the steel bricks around the beam pipe.
* I noticed the He tube had been pinched between the beam pipe and the most upstream steel brick underneath; talked to Todd who checked the tube (no damage) and pulled it to the side.
* The crew finished installing the bricks and put up 3 more blocks afterward.
* The wall should be finished tomorrow morning: one block needs to be moved a couple of inches to its final position and there are 2 more blocks to go into the northwest corner.
* The top of the wall is below the top of ROSIE and clearly visible from the ladder on the downstream west side of ROSIE; the view looking up at the ceiling mirror on the west side from the floor spans most of the top of the wall and probably could be adjusted to see the rest. |
|
|
8989
12/21/2020 18:43:25 |
Building
Beam
|
|
|
Yagmur Torun Entry Subject: Shield wall installation update
- Todd installed the beam pipe in the morning.
- The crew wanted feedback on the configuration after they started stacking the steel bricks around the beam pipe.
- I noticed the He tube had been pinched between the beam pipe and the most upstream steel brick underneath; talked to Todd who checked the tube (no damage) and pulled it to the side.
- The crew finished installing the bricks and put up 3 more blocks afterward.
- The wall should be finished tomorrow morning: one block needs to be moved a couple of inches to its final position and there are 2 more blocks to go into the northwest corner.
- The top of the wall is below the top of ROSIE and clearly visible from the ladder on the downstream west side of ROSIE; the view looking up at the ceiling mirror on the west side from the floor spans most of the top of the wall and probably could be adjusted to see the rest.
|
|
|
|
12/18/2020 |
DCS [asutton]
DCS
Expert
Trying another thing for the DCS R17 issues
Changing the setup scripts on the novadcs-test-01 to for R16 rather than use the daq-config setting
novadaq@novadcs-test-01:/home/novadaq/bin/start-opicssdcs.sh
novadcs@novadcs-test-01:~/bash_profiles/bashrc-novadcs
These have a few places where I've forced R16 |
|
|
8988
12/18/2020 09:58:04 |
DCS
DCS
Expert
|
|
|
Andrew Sutton Entry Subject: Trying another thing for the DCS R17 issues
Changing the setup scripts on the novadcs-test-01 to for R16 rather than use the daq-config setting
novadaq@novadcs-test-01:/home/novadaq/bin/start-opicssdcs.sh
novadcs@novadcs-test-01:~/bash_profiles/bashrc-novadcs
These have a few places where I've forced R16
|
|
|
|
12/16/2020 |
Detector DAQ [asutton]
DAQ Software
Expert
Another stab at R17 DCM weirdness
Poking a bit more at the NovaDaqDcs package in R17 I found a few more interesting files with differences:
NovaDaqDcs/epics/dbd/regIOC.dbd
R16:
< choice(menuConverttypeSdegF,"FEBTempADC2degreeC")
< choice(menuConverttypeSdegC,"TECCadc2degreeC")
---
R17:
> choice(menuConverttypeSdegF,"typeSdegF")
> choice(menuConverttypeSdegC,"typeSdegC")
NovaDaqDcs/epics/regIOCApp/src/O.Common/regIOC.dbd
R16:
< choice(menuConverttypeSdegF,"FEBTempADC2degreeC")
< choice(menuConverttypeSdegC,"TECCadc2degreeC")
---
R17:
> choice(menuConverttypeSdegF,"typeSdegF")
> choice(menuConverttypeSdegC,"typeSdegC")
NovaDaqDcs/epics/regIOCApp/src/O.linux-x86_64/regIOC.dbd.d
R16:
< ../O.Common/regIOC.dbd : ../../../dbd/menuConvert.dbd
---
R17:
> ../O.Common/regIOC.dbd : /nova/ups/epics/v3_14_12/dbd/menuConvert.dbd
I'm pretty sure that these are auto generated upon building and I'm not sure what changed to cause the difference. I think the path difference in NovaDaqDcs/epics/regIOCApp/src/O.linux-x86_64/regIOC.dbd.d caused the knock on changes to the other two .dbd files but I can't find any reason for the path change there (might just need to look harder). |
|
|
8987
12/16/2020 10:44:02 |
Detector DAQ
DAQ Software
Expert
|
|
|
Andrew Sutton Entry Subject: Another stab at R17 DCM weirdness
Poking a bit more at the NovaDaqDcs package in R17 I found a few more interesting files with differences:
NovaDaqDcs/epics/dbd/regIOC.dbd
R16:
< choice(menuConverttypeSdegF,"FEBTempADC2degreeC")
< choice(menuConverttypeSdegC,"TECCadc2degreeC")
---
R17:
> choice(menuConverttypeSdegF,"typeSdegF")
> choice(menuConverttypeSdegC,"typeSdegC")
NovaDaqDcs/epics/regIOCApp/src/O.Common/regIOC.dbd
R16:
< choice(menuConverttypeSdegF,"FEBTempADC2degreeC")
< choice(menuConverttypeSdegC,"TECCadc2degreeC")
---
R17:
> choice(menuConverttypeSdegF,"typeSdegF")
> choice(menuConverttypeSdegC,"typeSdegC")
NovaDaqDcs/epics/regIOCApp/src/O.linux-x86_64/regIOC.dbd.d
R16:
< ../O.Common/regIOC.dbd : ../../../dbd/menuConvert.dbd
---
R17:
> ../O.Common/regIOC.dbd : /nova/ups/epics/v3_14_12/dbd/menuConvert.dbd
I'm pretty sure that these are auto generated upon building and I'm not sure what changed to cause the difference. I think the path difference in NovaDaqDcs/epics/regIOCApp/src/O.linux-x86_64/regIOC.dbd.d caused the knock on changes to the other two .dbd files but I can't find any reason for the path change there (might just need to look harder).
|
|
|
|
12/15/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Yet another attempt at building R17.
Andrew S. noticed yesterday that there is some weirdness in some of the files in the build (particularly in NovaDaqDcs) where they have the full path /data/nova/novadaq... rather than following the symlink to just /nova/novadaq. This could be causing problems for any machine that isn't test-mgr-01, which only has the mount for /nova. I'm going to attempt another full clean build of R17, but do it on test-db this time instead of test-mgr-01. |
|
|
8986
12/15/2020 11:14:03 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Yet another attempt at building R17.
Andrew S. noticed yesterday that there is some weirdness in some of the files in the build (particularly in NovaDaqDcs) where they have the full path /data/nova/novadaq... rather than following the symlink to just /nova/novadaq. This could be causing problems for any machine that isn't test-mgr-01, which only has the mount for /nova. I'm going to attempt another full clean build of R17, but do it on test-db this time instead of test-mgr-01.
|
|
|
|
12/14/2020 |
Operations [torun]
TOF
TOF ORC heads-up
While Raymond Lewis was at MC7, I showed him the changes in the hall corresponding to the updates we intend to make to the ORCs
* locations of TOF detectors
* rerouted cables
* additional HV PS intended for one of the upstream muon halo paddles |
|
|
8985
12/14/2020 21:55:16 |
Operations
TOF
|
|
|
Yagmur Torun Entry Subject: TOF ORC heads-up
While Raymond Lewis was at MC7, I showed him the changes in the hall corresponding to the updates we intend to make to the ORCs
- locations of TOF detectors
- rerouted cables
- additional HV PS intended for one of the upstream muon halo paddles
|
|
 |
|
12/14/2020 |
Operations [torun]
Expert
MWPC
WC readout hardware update
After Mike got the OK from FTBF to swipe TDC cards from upstream (LArIAT) chambers, we started moving on this today
* I removed the bottom east card from the 2nd most upstream chamber in MC7a (labeled M) and connected it to the ethernet cable for the bottom west one on our WC3 (the one Andrew has identified as suspect)
* Andrew ID'ed the card through the controller, it reports the same firmware version but a different checksum compared to most of the cards we're using; not clear it needs a new firmware flash; Mike has contacted Terry K for guidance |
|
|
8984
12/14/2020 21:46:43 |
Operations
Expert
MWPC
|
|
|
Yagmur Torun Entry Subject: WC readout hardware update
After Mike got the OK from FTBF to swipe TDC cards from upstream (LArIAT) chambers, we started moving on this today
- I removed the bottom east card from the 2nd most upstream chamber in MC7a (labeled M) and connected it to the ethernet cable for the bottom west one on our WC3 (the one Andrew has identified as suspect)
- Andrew ID’ed the card through the controller, it reports the same firmware version but a different checksum compared to most of the cards we’re using; not clear it needs a new firmware flash; Mike has contacted Terry K for guidance
|
|
 |
|
12/14/2020 |
Planning [torun] Preparing for detector tilt - part 2
Did a walk-through with Jim Kilmer in the morning
* in addition to the sides which we have already cleared, they need access to the bottom of the detector in order to place jacks and shims underneath the center I-beam
* I moved miscellaneous components next to or stuffed under the detector blocks (oil barrels and carboys, fill cart and associated plumbing, tall ladder, etc.) to the edges of the containment mat; do not put anything inside the mat
* we still need to worry about not puncturing the mat, Jim is aware
* I wanted more through bolts installed connecting the I-beams of the 2 blocks for additional safety margin during lifts; closer inspection shows this is only possible for 2 holes on the center beams |
|
|
8983
12/14/2020 21:23:29 |
Planning
|
|
|
Yagmur Torun Entry Subject: Preparing for detector tilt - part 2
Did a walk-through with Jim Kilmer in the morning
- in addition to the sides which we have already cleared, they need access to the bottom of the detector in order to place jacks and shims underneath the center I-beam
- I moved miscellaneous components next to or stuffed under the detector blocks (oil barrels and carboys, fill cart and associated plumbing, tall ladder, etc.) to the edges of the containment mat; do not put anything inside the mat
- we still need to worry about not puncturing the mat, Jim is aware
- I wanted more through bolts installed connecting the I-beams of the 2 blocks for additional safety margin during lifts; closer inspection shows this is only possible for 2 holes on the center beams
|
|
 |
|
12/14/2020 |
Building [torun]
Beam
MC7a muon shielding status
- Wall configuration := talked to mechanical crew, Jim Kilmer and Raymond Lewis in the morning; Jim apparently had to make a change to the beam pipe hole due to limited supply of L-blocks; possible to move wall east by about 6" in that configuration (with respect to the old design drawing) by trimming one of the unistrut shelves recently installed to support JGG power cables but not without violating the minimum east aisle width
- East aisle := the racks on the east side taking up about a foot of aisle width were supposed to be removed weeks ago together with the rest; talked to Todd who (with help from Jim W) disconnected fans and smoke detectors on those racks and pulled them out; I moved the remaining loose cables and whatnot out of the way, problem solved; met again with Jim, Raymond and the mechanical crew and agreed to place the east edge of the shield wall 99" east of the beam centerline, (6" past ROSIE, roughly lined up with the edge of the concrete pad underneath)
- Installation := the 3 blocks installed Thursday were pulled today to cut and install the missing plywood base panels; 1 block was reinstalled and aligned by the end of the day, the rest should go smoothly |
|
|
8982
12/14/2020 20:46:41 |
Building
Beam
|
|
|
Yagmur Torun Entry Subject: MC7a muon shielding status
- Wall configuration
- talked to mechanical crew, Jim Kilmer and Raymond Lewis in the morning; Jim apparently had to make a change to the beam pipe hole due to limited supply of L-blocks; possible to move wall east by about 6” in that configuration (with respect to the old design drawing) by trimming one of the unistrut shelves recently installed to support JGG power cables but not without violating the minimum east aisle width
- East aisle
- the racks on the east side taking up about a foot of aisle width were supposed to be removed weeks ago together with the rest; talked to Todd who (with help from Jim W) disconnected fans and smoke detectors on those racks and pulled them out; I moved the remaining loose cables and whatnot out of the way, problem solved; met again with Jim, Raymond and the mechanical crew and agreed to place the east edge of the shield wall 99” east of the beam centerline, (6” past ROSIE, roughly lined up with the edge of the concrete pad underneath)
- Installation
- the 3 blocks installed Thursday were pulled today to cut and install the missing plywood base panels; 1 block was reinstalled and aligned by the end of the day, the rest should go smoothly
|
|
 |
|
12/11/2020 |
Operations [torun] Today's progress
* Dave hooked up a CO2 cylinder and started gas flow into the Ckov line
* Dave also unrolled the containment mat outside
* I put up the orange fence between WC4 and Ckov |
|
|
8981
12/11/2020 18:27:53 |
Operations
|
|
|
Yagmur Torun Entry Subject: Today's progress
- Dave hooked up a CO2 cylinder and started gas flow into the Ckov line
- Dave also unrolled the containment mat outside
- I put up the orange fence between WC4 and Ckov
|
|
|
|
12/11/2020 |
Operations [wallbank] Beamline Start Run Post-ToF-move cosmic run (US)
|
|
|
8980
12/11/2020 13:54:54 |
Operations
|
|
|
Mike Wallbank Entry Subject: Post-ToF-move cosmic run (US)
Form: | Beamline Start Run |
Run number: |
3596
|
Beamline detectors: |
Trigger board
Digitizer
TDU
|
Trigger conditions: |
ToF-US 3-of-4
|
Magnet Current: |
Off
|
Magnet Current Polarity: |
Off
|
MCenter Beam On?: |
False
|
Digitizer frequency: |
2.5 GHz
|
Comments: |
The arm in the US position is now the PMT arm which was moved from the DS location yesterday.
|
|
|
|
|
12/11/2020 |
Operations [wallbank] Beamline Start Run Post-ToF-move cosmic run
|
|
|
8979
12/11/2020 11:35:44 |
Operations
|
|
|
Mike Wallbank Entry Subject: Post-ToF-move cosmic run
Form: | Beamline Start Run |
Run number: |
3595
|
Beamline detectors: |
Trigger board
Digitizer
TDU
|
Trigger conditions: |
ToF-DS-1 (PMT) 3-of-4
|
Magnet Current: |
Off
|
Magnet Current Polarity: |
Off
|
MCenter Beam On?: |
False
|
Digitizer frequency: |
2.5 GHz
|
Comments: |
Arm is in its new location, between MWPC4 and Ckov.
|
|
|
 |
|
12/10/2020 |
Building [torun] MC7 rad fence and door fixed
The east side fence for the batting cage is back up with stainless clamps. Also a photo of the new MC7 upstream west door with the lock and signage installed. |
|
|
8978
12/10/2020 22:10:50 |
Building
|
|
|
Yagmur Torun Entry Subject: MC7 rad fence and door fixed
The east side fence for the batting cage is back up with stainless clamps. Also a photo of the new MC7 upstream west door with the lock and signage installed.
|
|
 |
|
12/10/2020 |
Operations [torun]
Cherenkov
MWPC
TOF
Beamline detectors back on
Todd carried out the "Big ToF Rearrangement" in the morning
* removed beam pipe section between WC4 and Ckov
* moved the thick-slab PMT-TOF from the upstream position to just upstream of the Ckov; it's now about 34.5" downstream of WC4
* moved the thin-slab PMT-TOF from next to the NOvA detector to the upstream position
Mike and I reconnected the TOFs at their new locations in the afternoon
* I pulled the DS-TOF signal and HV cables back along the cable trays to just above the rack and routed them overhead to the Ckov support block; this wasn't easy as the HV cables were being crushed by the heavy gauge detector power cables at the downstream end of the cable tray
* we left the HV cables connected to the same cow channels and changed the output voltages; this requires an update to the synoptic monitor settings
* we also checked the length of the PMT signal pigtails for the two TOFs and they seem to be the same (about 5')
All 3 TOFs, WCs and Ckov are now back on.
I noticed scratches on the downstream window of WC4, we should cover the windows whenever working near the chambers. |
|
|
8977
12/10/2020 21:55:05 |
Operations
Cherenkov
MWPC
TOF
|
|
|
Yagmur Torun Entry Subject: Beamline detectors back on
Todd carried out the “Big ToF Rearrangement” in the morning
- removed beam pipe section between WC4 and Ckov
- moved the thick-slab PMT-TOF from the upstream position to just upstream of the Ckov; it’s now about 34.5” downstream of WC4
- moved the thin-slab PMT-TOF from next to the NOvA detector to the upstream position
Mike and I reconnected the TOFs at their new locations in the afternoon
- I pulled the DS-TOF signal and HV cables back along the cable trays to just above the rack and routed them overhead to the Ckov support block; this wasn’t easy as the HV cables were being crushed by the heavy gauge detector power cables at the downstream end of the cable tray
- we left the HV cables connected to the same cow channels and changed the output voltages; this requires an update to the synoptic monitor settings
- we also checked the length of the PMT signal pigtails for the two TOFs and they seem to be the same (about 5’)
All 3 TOFs, WCs and Ckov are now back on.
I noticed scratches on the downstream window of WC4, we should cover the windows whenever working near the chambers.
|
|
 |
|
12/10/2020 |
Operations [torun]
Cherenkov
MWPC
TOF
Beamline detectors back on
Todd carried out the "Big ToF Rearrangement" in the morning
* removed beam pipe section between WC4 and Ckov
* moved the thick-slab PMT-TOF from the upstream position to just upstream of the Ckov; it's now about 34.5" downstream of WC4
* moved the thin-slab PMT-TOF from next to the NOvA detector to the upstream position
Mike and I reconnected the TOFs at their new locations in the afternoon
* I pulled the DS-TOF signal and HV cables back along the cable trays to just above the rack and routed them overhead to the Ckov support block; this wasn't easy as the HV cables were being crushed by the heavy gauge detector power cables at the downstream end of the cable tray
* we left the HV cables connected to the same cow channels and changed the output voltages; this requires an update to the synoptic monitor settings
* we also checked the length of the PMT signal pigtails for the two TOFs and they seem to be the same (about 5')
All 3 TOFs, WCs and Ckov are now back on.
I noticed scratches on the downstream window of WC4, we should cover the windows whenever working near the chambers. |
|
|
8976
12/10/2020 21:54:19 |
Operations
Cherenkov
MWPC
TOF
|
|
|
Yagmur Torun Entry Subject: Beamline detectors back on
Todd carried out the “Big ToF Rearrangement” in the morning
- removed beam pipe section between WC4 and Ckov
- moved the thick-slab PMT-TOF from the upstream position to just upstream of the Ckov; it’s now about 34.5” downstream of WC4
- moved the thin-slab PMT-TOF from next to the NOvA detector to the upstream position
Mike and I reconnected the TOFs at their new locations in the afternoon
- I pulled the DS-TOF signal and HV cables back along the cable trays to just above the rack and routed them overhead to the Ckov support block; this wasn’t easy as the HV cables were being crushed by the heavy gauge detector power cables at the downstream end of the cable tray
- we left the HV cables connected to the same cow channels and changed the output voltages; this requires an update to the synoptic monitor settings
- we also checked the length of the PMT signal pigtails for the two TOFs and they seem to be the same (about 5’)
All 3 TOFs, WCs and Ckov are now back on.
I noticed scratches on the downstream window of WC4, we should cover the windows whenever working near the chambers.
|
|
|
|
12/09/2020 |
Operations [wallbank]
Cherenkov
MWPC
TOF
Powering down beamline detectors, disconnecting PMTs
In preparation for the Big ToF Rearrangement tomorrow morning, I am removing power from all beamline detectors and disconnecting the PMTs (since these arms will be moved).
We will hopefully be able to bring things back tomorrow. |
|
|
8975
12/09/2020 17:26:56 |
Operations
Cherenkov
MWPC
TOF
|
|
|
Mike Wallbank Entry Subject: Powering down beamline detectors, disconnecting PMTs
In preparation for the Big ToF Rearrangement tomorrow morning, I am removing power from all beamline detectors and disconnecting the PMTs (since these arms will be moved).
We will hopefully be able to bring things back tomorrow.
|
|
|
|
12/09/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Clean build of R17.
We still had issues with switching to R17. This time the DCMs started their IOC just fine, but after cooling everything stayed in alarm on the CSS GUI despite being cold. I'm going to try a completely clean build of R17 using /home/novadaq/.cron/clean_base_release_all, and then another update_base_release_all. |
|
|
8974
12/09/2020 12:40:49 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Clean build of R17.
We still had issues with switching to R17. This time the DCMs started their IOC just fine, but after cooling everything stayed in alarm on the CSS GUI despite being cold. I'm going to try a completely clean build of R17 using /home/novadaq/.cron/clean_base_release_all, and then another update_base_release_all.
|
|
|
|
12/09/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Stopping detector run and rebooting detector to test dependency on old manager machines.
Seth turned off master, trigger, runcontrol, and datadisk at 9:30 this morning. I'm going to test that we don't have any dependencies on these machines and also switch to R17. More details will be on the main NOvA ECL "ECL-181594":https://dbweb8.fnal.gov:8443/ECL/nova/E/show?e=181594 |
|
|
8973
12/09/2020 09:55:44 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Stopping detector run and rebooting detector to test dependency on old manager machines.
Seth turned off master, trigger, runcontrol, and datadisk at 9:30 this morning. I’m going to test that we don’t have any dependencies on these machines and also switch to R17. More details will be on the main NOvA ECL ECL-181594
|
|
|
|
12/09/2020 |
Beamline DAQ [asutton]
Expert
MWPC
WC Tests
Going to be running WC tests throughout today to address the issues with WC3 having no hits on most of the west half-plane in X.
reference in the NOvA ECL: https://dbweb8.fnal.gov:8443/ECL/nova/E/show?e=181592 |
|
|
8972
12/09/2020 09:23:02 |
Beamline DAQ
Expert
MWPC
|
|
|
Andrew Sutton Entry Subject: WC Tests
Going to be running WC tests throughout today to address the issues with WC3 having no hits on most of the west half-plane in X.
reference in the NOvA ECL: https://dbweb8.fnal.gov:8443/ECL/nova/E/show?e=181592
|
|
|
|
12/07/2020 |
Detector DAQ [lackey32]
Expert
OnMon/EVD
Running onmon prod with gdb
The OnMon producer keeps crashing on subrun rollover when it tries closing the root file. I'm starting up the producer in a terminal using gdb to see if I can get some more information on the next crash. Viewer still running from the icon. |
|
|
8971
12/07/2020 14:49:36 |
Detector DAQ
Expert
OnMon/EVD
|
|
|
Teresa Lackey Entry Subject: Running onmon prod with gdb
The OnMon producer keeps crashing on subrun rollover when it tries closing the root file. I'm starting up the producer in a terminal using gdb to see if I can get some more information on the next crash. Viewer still running from the icon.
|
|
|
|
12/07/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Fixed R17 daqdcs build.
Last week we noticed the xcompile-opt-daqdcs build of R17 was messed up, leading to issues with the CSS GUI, since the startIOC scripts were missing from the LinuxPPC-GCC-maxopt bin (so DCMs weren't restarting the IOC on boot). The errors in the logfile from the build were just complaining about 'g++ command not found', so I did
yum install gcc-c++
and ran the build again. The scripts are now in the correct bin folder, so I think everything worked. We'll need to do a full test later this week once we've had enough continuous running to satisfy MCR. |
|
|
8970
12/07/2020 14:24:33 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Fixed R17 daqdcs build.
Last week we noticed the xcompile-opt-daqdcs build of R17 was messed up, leading to issues with the CSS GUI, since the startIOC scripts were missing from the LinuxPPC-GCC-maxopt bin (so DCMs weren't restarting the IOC on boot). The errors in the logfile from the build were just complaining about 'g++ command not found', so I did
yum install gcc-c++
and ran the build again. The scripts are now in the correct bin folder, so I think everything worked. We'll need to do a full test later this week once we've had enough continuous running to satisfy MCR.
|
|
|
|
12/05/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Updated msglogger node in kill partition.
Realized that the msglogger node in kill partition was still mgr-01, so kill partition wasn't killing any of the msglogger managers. It's now pointing to mgr-02. |
|
|
8969
12/05/2020 03:30:08 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Updated msglogger node in kill partition.
Realized that the msglogger node in kill partition was still mgr-01, so kill partition wasn't killing any of the msglogger managers. It's now pointing to mgr-02.
|
|
|
|
12/04/2020 |
Operations [wallbank] Powering up all systems and starting run to hand over to the NOvA shifter
We are turning on HV on the Cherenkov and the NOvA detector and starting a run. Aim to hand over to the NOvA shifter today. |
|
|
8968
12/04/2020 10:45:34 |
Operations
|
|
|
Mike Wallbank Entry Subject: Powering up all systems and starting run to hand over to the NOvA shifter
We are turning on HV on the Cherenkov and the NOvA detector and starting a run. Aim to hand over to the NOvA shifter today.
|
|
|
|
12/03/2020 |
Detector DAQ [wallbank]
APD
DCM
Expert
Powering down detector and testing power supply alarms
We're finishing our running for the day so I will end the run and power down the detector.
Tom and I are also planning to test the power supply alarms which he has set up as we power things down. |
|
|
8967
12/03/2020 16:27:00 |
Detector DAQ
APD
DCM
Expert
|
|
|
Mike Wallbank Entry Subject: Powering down detector and testing power supply alarms
We're finishing our running for the day so I will end the run and power down the detector.
Tom and I are also planning to test the power supply alarms which he has set up as we power things down.
|
|
 |
|
12/03/2020 |
Detector DAQ [lackey32]
DSO/Pedestal Scan
DSO Scan Report Scan for DCM2 after FEB 60 was replaced yesterday.
|
|
|
8966
12/03/2020 13:30:08 |
Detector DAQ
DSO/Pedestal Scan
|
|
|
Teresa Lackey Entry Subject: Scan for DCM2 after FEB 60 was replaced yesterday.
Form: | DSO Scan Report |
Detector is cool: |
True
|
Directory name (dcm 1+2): |
2020-12-03_13_21_50
|
Directory name (dcm 3): |
NA
|
Configuration Name: |
TestBeam_AllTrigs_FullDetector
|
Number of channels for dcms 1 + 2: |
1/58/1856
|
Number of channels for dcm 3: |
NA
|
: |
True
|
Comments?: |
FEB 50 had the most obvious differences, this is the one that was swapped. Since 59 and 60 had swapped cables, there are also some noticeable differences on 59.
|
Detector is still cool: |
True
|
|
|
|
|
12/03/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Rolling back to R16, DSO scan for dcm 2, starting a run.
There were issues with the xcompile-opt-daqdcs build in R17, so I'm rolling back to R16 while we investigate it. I'll do a DSO scan on dcm2 since it has a new FEB, and then I'll get a run going. Hopefully EVD/OnMon/DSOResultsViewer are all setup correctly now, but this is the first test of them now that test-db is SL7. |
|
|
8965
12/03/2020 13:05:11 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Rolling back to R16, DSO scan for dcm 2, starting a run.
There were issues with the xcompile-opt-daqdcs build in R17, so I'm rolling back to R16 while we investigate it. I'll do a DSO scan on dcm2 since it has a new FEB, and then I'll get a run going. Hopefully EVD/OnMon/DSOResultsViewer are all setup correctly now, but this is the first test of them now that test-db is SL7.
|
|
|
|
12/02/2020 |
Operations [torun] Preparing for detector tilt
Tom and I did some additional cleanup around the detector to make access easier for the mechanical crew for raising the east side
* routed the loose RTD cables hanging below the frame to the upstream face and parked them on the east side
* moved the mini-rack (muon paddle front end) at the southeast corner upstream and parked it under the gas panel; disconnected the signal cables from the back of the lemo-to-BNC patch panel (channels 1 through 4 top to bottom) |
|
|
8964
12/02/2020 17:54:03 |
Operations
|
|
|
Yagmur Torun Entry Subject: Preparing for detector tilt
Tom and I did some additional cleanup around the detector to make access easier for the mechanical crew for raising the east side
- routed the loose RTD cables hanging below the frame to the upstream face and parked them on the east side
- moved the mini-rack (muon paddle front end) at the southeast corner upstream and parked it under the gas panel; disconnected the signal cables from the back of the lemo-to-BNC patch panel (channels 1 through 4 top to bottom)
|
|
|
|
12/02/2020 |
Detector DAQ [wallbank]
APD
Expert
FEB
APD/FEB swaps
On Monday, we did the first lot of APD/FEB swaps. Tom's report:
https://docs.google.com/spreadsheets/d/1InBr0cJbPE2CITzb6eqFIH9XTBeeAHYPa4z698Vb-QI/edit#gid=0
I changed 3 APDs and 3 FEBs today. 2 APDs were due to faulty cooling, 1 is hopefully just a duplicate serial number issue.
Today we are doing one final FEB swap. Powering down the detector now.
FEB 5-1-2:59 |
|
|
8963
12/02/2020 12:54:51 |
Detector DAQ
APD
Expert
FEB
|
|
|
Mike Wallbank Entry Subject: APD/FEB swaps
On Monday, we did the first lot of APD/FEB swaps. Tom's report:
https://docs.google.com/spreadsheets/d/1InBr0cJbPE2CITzb6eqFIH9XTBeeAHYPa4z698Vb-QI/edit#gid=0
I changed 3 APDs and 3 FEBs today. 2 APDs were due to faulty cooling, 1 is hopefully just a duplicate serial number issue.
Today we are doing one final FEB swap. Powering down the detector now.
FEB 5-1-2:59
|
|
|
|
12/02/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Turning detector on and trying to switch to R17_00_00
Turning things on for the day. Going to try switching to R17. I need to setup the testrel first. |
|
|
8962
12/02/2020 06:51:42 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Turning detector on and trying to switch to R17_00_00
Turning things on for the day. Going to try switching to R17. I need to setup the testrel first.
|
|
 |
|
12/01/2020 |
Detector DAQ [lackey32]
DSO/Pedestal Scan
DSO Scan Report Scan after maintenance
|
|
|
8961
12/01/2020 11:17:54 |
Detector DAQ
DSO/Pedestal Scan
|
|
|
Teresa Lackey Entry Subject: Scan after maintenance
Form: | DSO Scan Report |
Detector is cool: |
True
|
Directory name (dcm 1+2): |
2020-12-01_11_03_37
|
Directory name (dcm 3): |
2020-12-01_11_08_46
|
Configuration Name: |
TestBeam_AllTrigs_FullDetector
|
Number of channels for dcms 1 + 2: |
2/118/3776
|
Number of channels for dcm 3: |
1/8/256
|
: |
True
|
Comments?: |
|
Detector is still cool: |
True
|
|
|
|
|
12/01/2020 |
Detector DAQ [lackey32]
Expert
Powering on HV, cooling detector, and starting a run.
Going to get a run going for the day so we can make new noise histories for tomorrow with the new APDs/FEBs to see how the swaps went. |
|
|
8960
12/01/2020 10:50:05 |
Detector DAQ
Expert
|
|
|
Teresa Lackey Entry Subject: Powering on HV, cooling detector, and starting a run.
Going to get a run going for the day so we can make new noise histories for tomorrow with the new APDs/FEBs to see how the swaps went.
|
|
|
|
11/30/2020 |
Beamline DAQ [asutton]
Expert
MWPC
WC Tests with new TDCs
Dave has replaced the needed TDCs and ASDQ cards. Going to take some runs to check the result of that. |
|
|
8959
11/30/2020 11:27:17 |
Beamline DAQ
Expert
MWPC
|
|
|
Andrew Sutton Entry Subject: WC Tests with new TDCs
Dave has replaced the needed TDCs and ASDQ cards. Going to take some runs to check the result of that.
|
|
|
|
11/29/2020 |
Operations [torun] Shutdown Daily Checklist
|
|
|
8958
11/29/2020 17:04:22 |
Operations
|
|
|
Yagmur Torun Entry Subject:
Form: | Shutdown Daily Checklist |
Current conditions: |
|
Check cameras: |
True
|
All power in the enclosure and magnet off: |
False
|
Temperature in MC7b: |
16.4 C
|
Dew-point in MC7b: |
1.4 C
|
Dew-point for dry gas output: |
-41.1 C
|
Input pressure for dry-gas flow: |
67 psi
|
Comments: |
|
|
|
|
|
11/27/2020 |
Beamline DAQ [lackey32]
Expert
Linking the TOFPrompt trigger config.
I'm going to switch the beamline to running with TOFPrompt and start and stop a beamline run. This should decrease the amount of triggers running through the TDUs, and make them plus OnMon a little happier (OnMon keeps crashing). |
|
|
8957
11/27/2020 11:00:07 |
Beamline DAQ
Expert
|
|
|
Teresa Lackey Entry Subject: Linking the TOFPrompt trigger config.
I'm going to switch the beamline to running with TOFPrompt and start and stop a beamline run. This should decrease the amount of triggers running through the TDUs, and make them plus OnMon a little happier (OnMon keeps crashing).
|
|
|
|
11/27/2020 |
Detector DAQ [lackey32]
DAQ Software
Expert
Running the detector for the day.
Doing some more work on DAQ stuff today. Most, if not all, of it shouldn't require bringing the run up and down, so I'll leave the detector running as much as possible for stability testing (and so I have data files to run nearline processing on). |
|
|
8956
11/27/2020 09:58:30 |
Detector DAQ
DAQ Software
Expert
|
|
|
Teresa Lackey Entry Subject: Running the detector for the day.
Doing some more work on DAQ stuff today. Most, if not all, of it shouldn't require bringing the run up and down, so I'll leave the detector running as much as possible for stability testing (and so I have data files to run nearline processing on).
|
|
 |
|
11/25/2020 |
Detector DAQ [lackey32]
DSO/Pedestal Scan
DSO Scan Report First DSO scan since March.
|
|
|
8955
11/25/2020 16:05:10 |
Detector DAQ
DSO/Pedestal Scan
|
|
|
Teresa Lackey Entry Subject: First DSO scan since March.
Form: | DSO Scan Report |
Detector is cool: |
True
|
Directory name (dcm 1+2): |
2020-11-25_15_28_28
|
Directory name (dcm 3): |
2020-11-25_15_41_41
|
Configuration Name: |
TestBeam_AllTrigs_FullDetector
|
Number of channels for dcms 1 + 2: |
2/118/3776
|
Number of channels for dcm 3: |
1/8/256
|
: |
True
|
Comments?: |
Scans segfault right at the end, but it's after the reprocessing has happened, so everything still worked.
|
Detector is still cool: |
True
|
|
Comments: